What we build, in detail

Four trades under one contract, all quoted after a site visit.

Program 01 · Permit before ordering

New buildings

We build to the architect's approved plans and we do not start before the permit is granted — a project begun without one stops at the commune and the cost of that lands on the client. The programme is written down, including the sequence between trades, which is where most delays actually come from.

  • Per project
  • Private clients and developers
  • Written quote
  • Permit granted

Start this program

Stage 1 · Survey

Site, access and ground conditions.

Stage 2 · Quote

Items, programme and exclusions.

Stage 3 · Permit

Confirmed before anything is ordered.

Stage 4 · Build

Trades sequenced, progress reported.

Stage 1 · Design

Circuits, loads and protection.

Stage 2 · Install

To the regulations in force.

Stage 3 · Inspection

By an approved body, arranged by us.

Stage 4 · Report

Handed over before commissioning.

Program 02 · Inspected, then commissioned

Electrical installation

Belgian law requires an approved inspection body to examine a new or substantially altered installation and find it compliant before it is energised for use. We book that inspection as part of the work and hand you the report. A contractor who skips it leaves you with an installation you cannot lawfully use and that an insurer may decline.

  • Per project
  • Homes and industry
  • Written quote
  • Inspection access

Start this program

Program 03 · Gas by qualified installers

Plumbing, heating and air conditioning

Gas appliance installation requires an installer holding the proper qualification, and we do not improvise around that. On heating we size the system to the building rather than to habit, because an oversized boiler cycles badly and an undersized one never satisfies the rooms furthest from it.

  • Per project
  • Homes and businesses
  • Written quote
  • Service connections

Start this program

Stage 1 · Sizing

To the building, not to a rule of thumb.

Stage 2 · Install

Sanitary, heating and ventilation.

Stage 3 · Gas

Only by a qualified installer.

Stage 4 · Commission

Balanced and documented.

Stage 1 · Substrate

Flatness and moisture measured.

Stage 2 · Wait if needed

Rather than covering wet screed.

Stage 3 · Movement joints

Where the run requires them.

Stage 4 · Finish

Snagged before handover.

Program 04 · Substrate decides it

Plastering, flooring and tiling

Tiles crack and floors fail because of what is underneath, not what is on top. Moisture content in a screed, movement joints in a long run, and a substrate that is flat enough — those decide whether a finish lasts. We check and wait rather than covering a screed that is still drying.

  • Per project
  • Homes and businesses
  • Written quote
  • Dry substrate

Start this program

Got a project to price?

A free site visit and a written quotation, with the exclusions set out.