Stage 1 · Survey
Site, access and ground conditions.
Four trades under one contract, all quoted after a site visit.
We build to the architect's approved plans and we do not start before the permit is granted — a project begun without one stops at the commune and the cost of that lands on the client. The programme is written down, including the sequence between trades, which is where most delays actually come from.
Site, access and ground conditions.
Items, programme and exclusions.
Confirmed before anything is ordered.
Trades sequenced, progress reported.
Circuits, loads and protection.
To the regulations in force.
By an approved body, arranged by us.
Handed over before commissioning.
Belgian law requires an approved inspection body to examine a new or substantially altered installation and find it compliant before it is energised for use. We book that inspection as part of the work and hand you the report. A contractor who skips it leaves you with an installation you cannot lawfully use and that an insurer may decline.
Gas appliance installation requires an installer holding the proper qualification, and we do not improvise around that. On heating we size the system to the building rather than to habit, because an oversized boiler cycles badly and an undersized one never satisfies the rooms furthest from it.
To the building, not to a rule of thumb.
Sanitary, heating and ventilation.
Only by a qualified installer.
Balanced and documented.
Flatness and moisture measured.
Rather than covering wet screed.
Where the run requires them.
Snagged before handover.
Tiles crack and floors fail because of what is underneath, not what is on top. Moisture content in a screed, movement joints in a long run, and a substrate that is flat enough — those decide whether a finish lasts. We check and wait rather than covering a screed that is still drying.
A free site visit and a written quotation, with the exclusions set out.